Projects

Sekondi-Takoradi Water Supply Expansion Project

Project Brief

Funded by Commerzbank AG of Germany with credit guarantee from the Austrian Export Credit Agency (OeKB), this project addresses the growing water demand of Sekondi-Takoradi Metropolis and surrounding communities in line with SDG 6. The project is planned in two phases drawing from the Pra River raw water source to meet the 2040 design horizon demand. Phase 1 covers construction of the intake structure and a 100,000 m³/day Water Treatment Plant with all ancillaries. Phase 2 includes an additional 100,000 m³/day WTP, a new DN 1200mm/900mm transmission pipeline, expansion of the intermediate booster pumping station at Inchaban, 273 km of distribution pipeline expansion, and enlargement of service reservoirs across the distribution system. EAP Consult provided engineering design and supervision services for this landmark infrastructure project.

Project Data

 

  • Design and construction of water treatment plant at Sekondi-Takoradi
  • Construction of a river bottom ramp (overflow weir) on the Pra River complete with all ancillaries for 220,000m3/day to cater for the 2040 water demand.
  • Construction of a raw water intake facility and pumping station with a capacity of maximum installed capacity of 220,000m3/day.
  • Construction of about 0.6km DN1200mm raw water pipeline.
  • Construction of a 100,000m3/day conventional water treatment plant complete with SCADA system for remote operation of the plant.
  • Construction of ancillary structures for the new Water Treatment Plant i.e., chemical building, chlorination building, administration building and workshop and garage.
  • Provision of a new 5,000m3 Clear Water Storage Tank
  • Construction of staff accommodation
  • Training of staff.