Funded by Belfius Bank of Belgium through ASPAC International, the Wenchi Water Supply Project replaces an aging 1975-era borehole system to serve over 100,000 people in the Wenchi Municipality and surrounding communities including Asuono, Awisa, Beposo, Droboso, Koase, Nkonsia, Wurompo, and Yoyoano. The works comprise construction of a new 12,500 m³/day water treatment plant, installation of a 2,300 m³ elevated metallic tank and a 900 m³ ground-level tank, 99.4 km of PE distribution pipeline, 13 km of DI transmission pipeline, 1.4 km of 450mm HDPE raw water pipeline, and 1,257 household connections with smart meters including 39 public standpipes. EAP Consult Limited is providing design review and full construction supervision. ASPAC International is the contractor. The 36-month contract commenced in August 2021 and is currently under extended completion, with a 12-month Defects Liability Period to follow.
A firm of Consulting Engineers specializing in Civil, Structural, Highway and Water Engineering across Ghana since 1997.
© 2026 EAP Consult Limited. All rights reserved.
CONSULTING ENGINEERS · ACCRA, GHANA